Echo of ParaSol 95PPU
---------------------------------
Max array limits:
MAX_SIMULATIONS=        30,000
MAX_OBSERVATIONS=       5,000
MAX_OBSERVED_VARIABLES= 30
MAX_PARAMETERS=         300

**** Reading  ParaSol_obs.dat   ***********
total number of variables=  3
   141   141   121
Variable_Name 1 = FLOW_OUT_1.txt
Variable_Name 2 = FLOW_OUT_3.txt
Variable_Name 3 = FLOW_OUT_7.txt

------------- Best Sim ---------
1  FLOW_OUT_1_1990  0.091540
2  FLOW_OUT_2_1990  2.676000
3  FLOW_OUT_3_1990  0.095100
4  FLOW_OUT_4_1990  0.205900
5  FLOW_OUT_5_1990  0.095860
6  FLOW_OUT_6_1990  0.045860
7  FLOW_OUT_7_1990  0.023060
8  FLOW_OUT_8_1990  0.011550
9  FLOW_OUT_9_1990  0.006699
10  FLOW_OUT_10_1990  0.014570
11  FLOW_OUT_11_1990  0.026320
12  FLOW_OUT_12_1990  0.038690
13  FLOW_OUT_1_1991  0.037140
14  FLOW_OUT_2_1991  0.032220
15  FLOW_OUT_3_1991  0.154900
16  FLOW_OUT_4_1991  0.497200
17  FLOW_OUT_5_1991  0.145500
18  FLOW_OUT_6_1991  0.076480
19  FLOW_OUT_7_1991  0.034790
20  FLOW_OUT_8_1991  0.016970
21  FLOW_OUT_9_1991  0.009271
22  FLOW_OUT_10_1991  0.022470
23  FLOW_OUT_11_1991  0.027220
24  FLOW_OUT_12_1991  0.135600
25  FLOW_OUT_1_1992  0.527900
26  FLOW_OUT_2_1992  1.502000
27  FLOW_OUT_3_1992  0.079090
28  FLOW_OUT_4_1992  0.132700
29  FLOW_OUT_5_1992  0.101000
30  FLOW_OUT_6_1992  0.071870
31  FLOW_OUT_7_1992  0.035460
32  FLOW_OUT_8_1992  0.018330
33  FLOW_OUT_9_1992  0.011400
34  FLOW_OUT_10_1992  0.007420
35  FLOW_OUT_11_1992  0.013850
36  FLOW_OUT_12_1992  0.047970
37  FLOW_OUT_1_1993  0.026220
38  FLOW_OUT_2_1993  0.030040
39  FLOW_OUT_3_1993  0.132900
40  FLOW_OUT_4_1993  0.112400
41  FLOW_OUT_5_1993  0.137100
42  FLOW_OUT_6_1993  0.102600
43  FLOW_OUT_7_1993  0.047010
44  FLOW_OUT_8_1993  0.023820
45  FLOW_OUT_9_1993  0.013960
46  FLOW_OUT_10_1993  0.011480
47  FLOW_OUT_11_1993  0.177500
48  FLOW_OUT_12_1993  0.199000
49  FLOW_OUT_1_1994  0.525000
50  FLOW_OUT_2_1994  0.110800
51  FLOW_OUT_3_1994  0.113400
52  FLOW_OUT_4_1994  0.108400
53  FLOW_OUT_5_1994  0.088250
54  FLOW_OUT_6_1994  0.045020
55  FLOW_OUT_7_1994  0.022430
56  FLOW_OUT_8_1994  0.012610
57  FLOW_OUT_9_1994  0.008338
58  FLOW_OUT_10_1994  0.018470
59  FLOW_OUT_11_1994  0.156100
60  FLOW_OUT_12_1994  0.102800
61  FLOW_OUT_1_1995  0.061410
62  FLOW_OUT_2_1995  0.051100
63  FLOW_OUT_3_1995  0.038790
64  FLOW_OUT_4_1995  0.063430
65  FLOW_OUT_5_1995  0.082320
66  FLOW_OUT_6_1995  0.042770
67  FLOW_OUT_7_1995  0.024000
68  FLOW_OUT_8_1995  0.012280
69  FLOW_OUT_9_1995  0.011400
70  FLOW_OUT_10_1995  0.014940
71  FLOW_OUT_11_1995  0.008129
72  FLOW_OUT_12_1995  0.005260
73  FLOW_OUT_1_1996  0.027910
74  FLOW_OUT_2_1996  0.017650
75  FLOW_OUT_3_1996  0.092520
76  FLOW_OUT_4_1996  0.127500
77  FLOW_OUT_5_1996  0.101600
78  FLOW_OUT_6_1996  0.053180
79  FLOW_OUT_7_1996  0.024160
80  FLOW_OUT_8_1996  0.011790
81  FLOW_OUT_9_1996  0.009873
82  FLOW_OUT_10_1996  0.022850
83  FLOW_OUT_11_1996  0.037230
84  FLOW_OUT_12_1996  0.032660
85  FLOW_OUT_1_1997  0.022090
86  FLOW_OUT_2_1997  0.218300
87  FLOW_OUT_3_1997  0.050350
88  FLOW_OUT_4_1997  0.035840
89  FLOW_OUT_5_1997  0.055070
90  FLOW_OUT_6_1997  0.072970
91  FLOW_OUT_7_1997  0.088870
92  FLOW_OUT_8_1997  0.042590
93  FLOW_OUT_9_1997  0.021080
94  FLOW_OUT_10_1997  0.011470
95  FLOW_OUT_11_1997  0.079510
96  FLOW_OUT_12_1997  0.056900
97  FLOW_OUT_1_1998  0.028010
98  FLOW_OUT_2_1998  0.998900
99  FLOW_OUT_3_1998  0.411800
100  FLOW_OUT_4_1998  0.105600
101  FLOW_OUT_5_1998  0.090900
102  FLOW_OUT_6_1998  0.063120
103  FLOW_OUT_7_1998  0.036870
104  FLOW_OUT_8_1998  0.031400
105  FLOW_OUT_9_1998  0.016020
106  FLOW_OUT_10_1998  0.013720
107  FLOW_OUT_11_1998  0.022100
108  FLOW_OUT_12_1998  0.017030
109  FLOW_OUT_1_1999  0.053960
110  FLOW_OUT_2_1999  0.039890
111  FLOW_OUT_3_1999  0.024790
112  FLOW_OUT_4_1999  0.036970
113  FLOW_OUT_5_1999  0.031580
114  FLOW_OUT_6_1999  0.017420
115  FLOW_OUT_7_1999  0.011770
116  FLOW_OUT_8_1999  0.012190
117  FLOW_OUT_9_1999  0.007434
118  FLOW_OUT_10_1999  0.006214
119  FLOW_OUT_11_1999  0.046300
120  FLOW_OUT_12_1999  0.030290
121  FLOW_OUT_1_2000  0.036030
122  FLOW_OUT_2_2000  0.019660
123  FLOW_OUT_3_2000  0.080540
124  FLOW_OUT_4_2000  0.148700
125  FLOW_OUT_5_2000  0.092920
126  FLOW_OUT_6_2000  0.052350
127  FLOW_OUT_7_2000  0.023720
128  FLOW_OUT_8_2000  0.011330
129  FLOW_OUT_9_2000  0.006571
130  FLOW_OUT_10_2000  0.015880
131  FLOW_OUT_11_2000  0.048660
132  FLOW_OUT_12_2000  0.061940
133  FLOW_OUT_1_2001  0.076330
134  FLOW_OUT_2_2001  0.035700
135  FLOW_OUT_3_2001  0.037030
136  FLOW_OUT_4_2001  0.044740
137  FLOW_OUT_5_2001  0.047780
138  FLOW_OUT_6_2001  0.022640
139  FLOW_OUT_7_2001  0.010830
140  FLOW_OUT_8_2001  0.005750
141  FLOW_OUT_9_2001  0.004971
1  FLOW_OUT_1_1990  1.121000
2  FLOW_OUT_2_1990  12.740000
3  FLOW_OUT_3_1990  1.293000
4  FLOW_OUT_4_1990  1.401000
5  FLOW_OUT_5_1990  1.320000
6  FLOW_OUT_6_1990  1.271000
7  FLOW_OUT_7_1990  1.247000
8  FLOW_OUT_8_1990  1.234000
9  FLOW_OUT_9_1990  1.228000
10  FLOW_OUT_10_1990  1.237000
11  FLOW_OUT_11_1990  1.253000
12  FLOW_OUT_12_1990  1.270000
13  FLOW_OUT_1_1991  1.274000
14  FLOW_OUT_2_1991  1.274000
15  FLOW_OUT_3_1991  1.409000
16  FLOW_OUT_4_1991  1.720000
17  FLOW_OUT_5_1991  1.461000
18  FLOW_OUT_6_1991  1.396000
19  FLOW_OUT_7_1991  1.355000
20  FLOW_OUT_8_1991  1.336000
21  FLOW_OUT_9_1991  1.328000
22  FLOW_OUT_10_1991  1.344000
23  FLOW_OUT_11_1991  1.353000
24  FLOW_OUT_12_1991  1.474000
25  FLOW_OUT_1_1992  1.869000
26  FLOW_OUT_2_1992  4.703000
27  FLOW_OUT_3_1992  1.720000
28  FLOW_OUT_4_1992  1.770000
29  FLOW_OUT_5_1992  1.770000
30  FLOW_OUT_6_1992  1.748000
31  FLOW_OUT_7_1992  1.716000
32  FLOW_OUT_8_1992  1.702000
33  FLOW_OUT_9_1992  1.698000
34  FLOW_OUT_10_1992  1.699000
35  FLOW_OUT_11_1992  1.711000
36  FLOW_OUT_12_1992  1.756000
37  FLOW_OUT_1_1993  1.742000
38  FLOW_OUT_2_1993  1.754000
39  FLOW_OUT_3_1993  1.873000
40  FLOW_OUT_4_1993  1.866000
41  FLOW_OUT_5_1993  1.905000
42  FLOW_OUT_6_1993  1.880000
43  FLOW_OUT_7_1993  1.828000
44  FLOW_OUT_8_1993  1.808000
45  FLOW_OUT_9_1993  1.801000
46  FLOW_OUT_10_1993  1.803000
47  FLOW_OUT_11_1993  1.989000
48  FLOW_OUT_12_1993  2.031000
49  FLOW_OUT_1_1994  2.599000
50  FLOW_OUT_2_1994  2.016000
51  FLOW_OUT_3_1994  2.046000
52  FLOW_OUT_4_1994  2.061000
53  FLOW_OUT_5_1994  2.051000
54  FLOW_OUT_6_1994  2.012000
55  FLOW_OUT_7_1994  1.994000
56  FLOW_OUT_8_1994  1.987000
57  FLOW_OUT_9_1994  1.987000
58  FLOW_OUT_10_1994  2.004000
59  FLOW_OUT_11_1994  2.163000
60  FLOW_OUT_12_1994  2.134000
61  FLOW_OUT_1_1995  2.106000
62  FLOW_OUT_2_1995  2.108000
63  FLOW_OUT_3_1995  2.107000
64  FLOW_OUT_4_1995  2.144000
65  FLOW_OUT_5_1995  2.178000
66  FLOW_OUT_6_1995  2.147000
67  FLOW_OUT_7_1995  2.135000
68  FLOW_OUT_8_1995  2.130000
69  FLOW_OUT_9_1995  2.137000
70  FLOW_OUT_10_1995  2.150000
71  FLOW_OUT_11_1995  2.153000
72  FLOW_OUT_12_1995  2.161000
73  FLOW_OUT_1_1996  2.197000
74  FLOW_OUT_2_1996  2.198000
75  FLOW_OUT_3_1996  2.290000
76  FLOW_OUT_4_1996  2.349000
77  FLOW_OUT_5_1996  2.344000
78  FLOW_OUT_6_1996  2.307000
79  FLOW_OUT_7_1996  2.287000
80  FLOW_OUT_8_1996  2.283000
81  FLOW_OUT_9_1996  2.290000
82  FLOW_OUT_10_1996  2.315000
83  FLOW_OUT_11_1996  2.344000
84  FLOW_OUT_12_1996  2.353000
85  FLOW_OUT_1_1997  2.356000
86  FLOW_OUT_2_1997  2.609000
87  FLOW_OUT_3_1997  2.434000
88  FLOW_OUT_4_1997  2.433000
89  FLOW_OUT_5_1997  2.465000
90  FLOW_OUT_6_1997  2.497000
91  FLOW_OUT_7_1997  2.527000
92  FLOW_OUT_8_1997  2.490000
93  FLOW_OUT_9_1997  2.478000
94  FLOW_OUT_10_1997  2.478000
95  FLOW_OUT_11_1997  2.564000
96  FLOW_OUT_12_1997  2.556000
97  FLOW_OUT_1_1998  2.540000
98  FLOW_OUT_2_1998  8.950000
99  FLOW_OUT_3_1998  3.045000
100  FLOW_OUT_4_1998  2.833000
101  FLOW_OUT_5_1998  2.834000
102  FLOW_OUT_6_1998  2.819000
103  FLOW_OUT_7_1998  2.803000
104  FLOW_OUT_8_1998  2.808000
105  FLOW_OUT_9_1998  2.802000
106  FLOW_OUT_10_1998  2.810000
107  FLOW_OUT_11_1998  2.831000
108  FLOW_OUT_12_1998  2.839000
109  FLOW_OUT_1_1999  2.892000
110  FLOW_OUT_2_1999  2.893000
111  FLOW_OUT_3_1999  2.889000
112  FLOW_OUT_4_1999  2.914000
113  FLOW_OUT_5_1999  2.920000
114  FLOW_OUT_6_1999  2.914000
115  FLOW_OUT_7_1999  2.916000
116  FLOW_OUT_8_1999  2.925000
117  FLOW_OUT_9_1999  2.929000
118  FLOW_OUT_10_1999  2.937000
119  FLOW_OUT_11_1999  2.992000
120  FLOW_OUT_12_1999  2.989000
121  FLOW_OUT_1_2000  3.009000
122  FLOW_OUT_2_2000  3.005000
123  FLOW_OUT_3_2000  3.078000
124  FLOW_OUT_4_2000  3.173000
125  FLOW_OUT_5_2000  3.131000
126  FLOW_OUT_6_2000  3.101000
127  FLOW_OUT_7_2000  3.080000
128  FLOW_OUT_8_2000  3.075000
129  FLOW_OUT_9_2000  3.078000
130  FLOW_OUT_10_2000  3.097000
131  FLOW_OUT_11_2000  3.144000
132  FLOW_OUT_12_2000  3.173000
133  FLOW_OUT_1_2001  3.204000
134  FLOW_OUT_2_2001  3.176000
135  FLOW_OUT_3_2001  3.189000
136  FLOW_OUT_4_2001  3.208000
137  FLOW_OUT_5_2001  3.223000
138  FLOW_OUT_6_2001  3.205000
139  FLOW_OUT_7_2001  3.199000
140  FLOW_OUT_8_2001  3.200000
141  FLOW_OUT_9_2001  3.207000
11  FLOW_OUT_11_1990  1.493000
12  FLOW_OUT_12_1990  1.494000
13  FLOW_OUT_1_1991  1.496000
14  FLOW_OUT_2_1991  1.650000
15  FLOW_OUT_3_1991  2.236000
16  FLOW_OUT_4_1991  2.411000
17  FLOW_OUT_5_1991  1.642000
18  FLOW_OUT_6_1991  1.645000
19  FLOW_OUT_7_1991  1.642000
20  FLOW_OUT_8_1991  1.637000
21  FLOW_OUT_9_1991  1.633000
22  FLOW_OUT_10_1991  1.632000
23  FLOW_OUT_11_1991  1.635000
24  FLOW_OUT_12_1991  1.644000
25  FLOW_OUT_1_1992  3.417000
26  FLOW_OUT_2_1992  13.120000
27  FLOW_OUT_3_1992  3.121000
28  FLOW_OUT_4_1992  2.332000
29  FLOW_OUT_5_1992  2.239000
30  FLOW_OUT_6_1992  2.247000
31  FLOW_OUT_7_1992  2.248000
32  FLOW_OUT_8_1992  2.248000
33  FLOW_OUT_9_1992  2.248000
34  FLOW_OUT_10_1992  2.249000
35  FLOW_OUT_11_1992  2.251000
36  FLOW_OUT_12_1992  2.258000
37  FLOW_OUT_1_1993  2.265000
38  FLOW_OUT_2_1993  2.273000
39  FLOW_OUT_3_1993  2.289000
40  FLOW_OUT_4_1993  2.302000
41  FLOW_OUT_5_1993  2.315000
42  FLOW_OUT_6_1993  2.325000
43  FLOW_OUT_7_1993  2.328000
44  FLOW_OUT_8_1993  2.330000
45  FLOW_OUT_9_1993  2.333000
46  FLOW_OUT_10_1993  2.336000
47  FLOW_OUT_11_1993  2.355000
48  FLOW_OUT_12_1993  2.735000
49  FLOW_OUT_1_1994  3.009000
50  FLOW_OUT_2_1994  2.982000
51  FLOW_OUT_3_1994  2.663000
52  FLOW_OUT_4_1994  2.658000
53  FLOW_OUT_5_1994  2.669000
54  FLOW_OUT_6_1994  2.676000
55  FLOW_OUT_7_1994  2.679000
56  FLOW_OUT_8_1994  2.680000
57  FLOW_OUT_9_1994  2.683000
58  FLOW_OUT_10_1994  2.688000
59  FLOW_OUT_11_1994  3.530000
60  FLOW_OUT_12_1994  2.897000
61  FLOW_OUT_1_1995  2.911000
62  FLOW_OUT_2_1995  2.923000
63  FLOW_OUT_3_1995  2.933000
64  FLOW_OUT_4_1995  2.944000
65  FLOW_OUT_5_1995  2.977000
66  FLOW_OUT_6_1995  2.994000
67  FLOW_OUT_7_1995  3.001000
68  FLOW_OUT_8_1995  3.006000
69  FLOW_OUT_9_1995  3.011000
70  FLOW_OUT_10_1995  3.018000
71  FLOW_OUT_11_1995  3.026000
72  FLOW_OUT_12_1995  3.035000
73  FLOW_OUT_1_1996  3.046000
74  FLOW_OUT_2_1996  3.056000
75  FLOW_OUT_3_1996  3.070000
76  FLOW_OUT_4_1996  3.857000
77  FLOW_OUT_5_1996  3.249000
78  FLOW_OUT_6_1996  3.259000
79  FLOW_OUT_7_1996  3.265000
80  FLOW_OUT_8_1996  3.270000
81  FLOW_OUT_9_1996  3.275000
82  FLOW_OUT_10_1996  3.283000
83  FLOW_OUT_11_1996  3.295000
84  FLOW_OUT_12_1996  3.306000
85  FLOW_OUT_1_1997  3.317000
86  FLOW_OUT_2_1997  4.020000
87  FLOW_OUT_3_1997  3.352000
88  FLOW_OUT_4_1997  3.361000
89  FLOW_OUT_5_1997  3.371000
90  FLOW_OUT_6_1997  3.381000
91  FLOW_OUT_7_1997  3.390000
92  FLOW_OUT_8_1997  3.395000
93  FLOW_OUT_9_1997  3.400000
94  FLOW_OUT_10_1997  3.406000
95  FLOW_OUT_11_1997  3.419000
96  FLOW_OUT_12_1997  3.433000
97  FLOW_OUT_1_1998  3.445000
98  FLOW_OUT_2_1998  15.630000
99  FLOW_OUT_3_1998  4.831000
100  FLOW_OUT_4_1998  3.747000
101  FLOW_OUT_5_1998  3.760000
102  FLOW_OUT_6_1998  3.769000
103  FLOW_OUT_7_1998  3.774000
104  FLOW_OUT_8_1998  3.778000
105  FLOW_OUT_9_1998  3.782000
106  FLOW_OUT_10_1998  3.787000
107  FLOW_OUT_11_1998  3.795000
108  FLOW_OUT_12_1998  3.804000
109  FLOW_OUT_1_1999  3.815000
110  FLOW_OUT_2_1999  3.824000
111  FLOW_OUT_3_1999  3.832000
112  FLOW_OUT_4_1999  3.840000
113  FLOW_OUT_5_1999  3.846000
114  FLOW_OUT_6_1999  3.849000
115  FLOW_OUT_7_1999  3.851000
116  FLOW_OUT_8_1999  3.853000
117  FLOW_OUT_9_1999  3.855000
118  FLOW_OUT_10_1999  3.859000
119  FLOW_OUT_11_1999  3.868000
120  FLOW_OUT_12_1999  3.877000
121  FLOW_OUT_1_2000  3.886000
122  FLOW_OUT_2_2000  3.899000
123  FLOW_OUT_3_2000  4.019000
124  FLOW_OUT_4_2000  3.949000
125  FLOW_OUT_5_2000  3.961000
126  FLOW_OUT_6_2000  3.968000
127  FLOW_OUT_7_2000  3.970000
128  FLOW_OUT_8_2000  3.971000
129  FLOW_OUT_9_2000  3.973000
130  FLOW_OUT_10_2000  3.979000
131  FLOW_OUT_11_2000  3.989000
finished reading best simulation
------------ Fix paraout
number of parameters = 13
total sim= 1000

good_par= 1   No_Goodpar=572
good_par= 2   No_Goodpar=800
good_par= 3   No_Goodpar=896
good_par= 4   No_Goodpar=904
good_par= 5   No_Goodpar=905
good_par= 6   No_Goodpar=908
good_par= 7   No_Goodpar=0
no of good sims=  6 

opened  1  Para_Sol.OUT\FLOW_OUT_1.txt
opened  2  Para_Sol.OUT\FLOW_OUT_3.txt
opened  3  Para_Sol.OUT\FLOW_OUT_7.txt

in_file=  Para_Sol.OUT\tps_FLOW_OUT_1.txt
in_file=  Para_Sol.OUT\FLOW_OUT_1.txt
in_file=  Para_Sol.OUT\tps_FLOW_OUT_3.txt
in_file=  Para_Sol.OUT\FLOW_OUT_3.txt
in_file=  Para_Sol.OUT\tps_FLOW_OUT_7.txt
in_file=  Para_Sol.OUT\FLOW_OUT_7.txt
------------------ 95PPU   
